Booking now Switchboard safety checks on weekday mornings through November, with a two-hour arrival window confirmed the day before. Reserve a slot
Maple Orbit Licensed Electrician
Electrician in protective gloves working inside an opened distribution board, testing circuit connections

Northvale · Kerrick · Bell Harbour

Old wiring,read properly.

Maple Orbit is a two-van domestic outfit. We test before we open anything, put the scope and price in writing, and leave a labelled board behind. Switchboards, staged rewires, lighting, EV supply and the faults nobody else could find.

Call-out windows
Morning, afternoon or late slots on weekdays, plus Saturday mornings.
No power at all
Loss-of-supply and burning-smell calls jump the queue, same day.
Written before work
Fixed scope, parts list and price approved by you before a cable is cut.

Symptom index

Start with what your house is actually doing

Most calls begin with one of these nine. Find the closest match, read the likely cause, and you will know roughly what we test on arrival before you book anything.

A breaker trips when the kettle and toaster run together

Usual causeThe circuit is loaded past its rating, often an older radial feeding a kitchen full of modern appliances.

What we checkMetered load under real conditions, breaker rating against cable size, then a price for a dedicated appliance circuit.

Prompt

Lights dim or flicker whenever the heat pump starts

Usual causeVoltage drop from an undersized supply cable, or a neutral that has worked loose at the board.

What we checkTorque check on every board termination, voltage logged under load, main tails and meter connections inspected.

Urgent

A warm faceplate, or a scorch mark beside a socket

Usual causeA loose conductor arcing behind the plate. It does not settle down on its own.

What we checkCircuit isolated the same day, accessory opened and inspected, plate and damaged cable tail replaced.

Urgent

A burning or fishy smell with no visible source

Usual causeOverheating insulation, usually at a buried junction inside a wall or ceiling void.

What we checkThermal sweep along the circuit, the nearest accessible junctions opened, insulation resistance tested end to end.

Urgent

The RCD trips overnight but resets fine in the morning

Usual causeMoisture tracking into an outdoor accessory, or one failing appliance sitting on a shared RCD.

What we checkCircuit split to isolate the leak, earth leakage measured, wet-area circuits moved onto their own RCBO.

Prompt

Half the sockets in one room are dead

Usual causeA broken ring, or a single failed connection at one accessory partway around it.

What we checkContinuity tested both directions, the break located, connection reinstated and the whole ring retested.

Prompt

Two-pin sockets and a board full of rewirable fuses

Usual causeA pre-1970s installation with no earth on the lighting circuits and no RCD protection anywhere.

What we checkFull condition report first, then a staged rewire plan you can spread across rooms and seasons.

Routine

Nowhere safe to charge an EV on the driveway

Usual causeNo spare way left on the board, and no protected route out to where the car actually parks.

What we checkLoad calculation against the main fuse, a cable route survey, then a charger on its own RCBO.

Routine

Downlights buzz, or cut out after twenty minutes

Usual causeThermal cut-outs tripping in unvented fittings, or a dimmer module mismatched to a small LED load.

What we checkClearance above each fitting in the ceiling void, dimmer matched to lamp load, vented fittings where insulation is tight.

Routine

Service matrix

Six workstreams, and what each one really involves

Durations are typical for an average three-bedroom home and are confirmed after the survey. Anything outside these lanes we will say so plainly rather than improvise.

Services with scope, typical time on site and what is included
Workstream Scope Time on site Included
Switchboard upgrade Replace a fuse board with an RCBO-per-circuit board and label every way. Half a day, with power down in short stages. New enclosure, RCBOs, main switch, printed circuit schedule, test certificate.
Staged rewire Room-by-room replacement of rubber or fabric-insulated cable. Two to four days per stage. Chased cable runs, new accessories, plaster lines made good, written stage sign-off.
Fault finding Trace tripping, earth leakage and dead-circuit faults to a single cause. About two hours to diagnose. Insulation and continuity testing, the finding in writing, repair priced before we continue.
Lighting & dimming Replace fittings, add circuits, match dimmer modules to LED loads. Two to five hours. Vented fittings where clearance is tight, load-matched dimmers, old fittings taken away.
EV charger supply A dedicated supply from the board out to a driveway or garage unit. One day. Load calculation, protected cable route, its own RCBO, commissioning notes.
Safety inspection Condition report on an installation before a purchase or a letting. Two to three hours. Circuit-by-circuit results, coded observations, a plain-language priority list.
Electrician holding a multimeter against wiring terminals while checking readings on site
Every circuit is proved dead and then metered before any accessory is opened.

How a visit runs

Four steps, in this order, every time

No open-ended day rates and no work starting on a verbal estimate. If step three changes what we found in step two, you get a revised figure before we carry on.

01

Pick a window

You choose morning, afternoon or a late slot. We confirm a two-hour arrival window the day before, and message if the van is running early.

02

Isolate and test

The affected circuit goes off, we prove it dead, then meter it. Readings are written down before anything is dismantled or replaced.

03

Fixed scope in writing

You see the work, the parts and the price together. Approve it and we start; leave it and you owe only the diagnostic time.

04

Certificate and notes

Test results, an updated circuit schedule inside the board door, and a written note of anything we suggest keeping an eye on next year.

Standards & field notes

What separates a tidy job from a quick one

Most of the faults we are called to were installed by someone in a hurry. A junction buried behind plaster with no access. A 2.5mm cable pushed onto a 32A breaker because it was what was on the van. Lighting circuits extended off a socket ring. None of it fails on the day it is done, which is exactly why it keeps happening.

So we work to a slower checklist. Cable is sized to the run length and the load, not to the breaker that happens to be spare. Every joint is either in an accessory or in an accessible enclosure. Boards get a printed schedule that matches reality, because the next person in there may not be us.

When we find something out of scope, you hear about it the same visit with a code and a plain sentence explaining whether it matters this month or this decade. No scare quotes, no bundled upsell.

  • Continuity, insulation resistance, polarity and loop impedance recorded on every circuit we touch.
  • Cable sized on run length and load, with voltage drop calculated rather than guessed.
  • No buried junctions: joints sit in accessories or accessible enclosures only.
  • Printed circuit schedule fitted inside the board door, matching the installation as left.
  • Dust sheets down, cores vacuumed, and plaster lines made good before we leave.
  • Observations coded and explained in ordinary language, with priority, not pressure.
Bright living room with layered lighting after a domestic lighting and dimming upgrade
A finished lighting stage: vented fittings, load-matched dimming and no visible cable chases.

Request a visit

Tell us what it is doing

A short description beats a long one. What happens, when it started, and whether anything changed in the house just before it began.

  • We reply with a window and a diagnostic figure, not a vague range.
  • If the power is off or something smells hot, mark the box below and we prioritise it.
  • Photographs of the board help us arrive with the right parts.

We use these details only to arrange and price the visit.